List the equipment and its ratings
A storage shed with a light is different from a workshop running a compressor, welder and machinery. Send the equipment nameplates or installation details where available, and tell us what will run at the same time.
Future plans matter too. If larger equipment is likely, discuss it now so the options are clear. We do not assume that a shed needs three-phase power just because it is used as a workshop.
Place outlets around the work
Mark benches, doors, storage and fixed equipment on a rough layout. Outlets behind shelves or a machine can become inconvenient immediately. Task lighting should reach the work surface without relying on a single light behind you.
Separate lighting controls can be useful where the shed has distinct work and storage areas. Outdoor lighting near the entry is another item to include.
Plan the supply route
The existing switchboard, distance to the shed and available cable routes all affect the supply. A sub-board may make sense for a larger installation, but the design depends on the load and property supply.
Tell us about paving and vehicle access before trenching is planned. Underground services need to be located and the route agreed before excavation. Electrical trenching is not a job to improvise from a sketch alone.
Agree the scope before construction
Ask what is included in the electrical quote and who is arranging excavation, building work and reinstatement. If the shed is being lined, coordinate the wiring before the lining goes on.
We can quote shed electrical work once we understand the building, equipment and supply. Photos and the shed plan help make that first discussion useful.

